Structure removal work - メーカー・企業と製品の一覧 | イプロス

Structure removal workの製品一覧

1~1 件を表示 / 全 1 件

表示件数

All Casing Application Method: Existing Structure Demolition Work

Active in the foundation removal of underground structures due to redevelopment construction and new foundation work!

Our company has carried out the "Removal of Existing Structures" using the all-casing method. The all-casing method, introduced from France's Benot company, has evolved with the times, transitioning from a swinging type to a fully rotating type. What was once difficult, such as excavating hard rock and reinforced concrete, has become possible due to advancements in technology and skills, as well as the experience we have gained. It is now actively used in the removal of underground structures associated with redevelopment projects and in new foundation construction. 【Obstacle Removal Flow】 1. Installation 2. Excavation (reaching the obstacle) 3. Press-in excavation 4. Excavation 5. Obstacle crushing 6. Obstacle removal complete 7. Backfilling (fluidized treated soil) 8. Backfilling complete *For more details, please refer to the PDF document or feel free to contact us.

  • image_02.png
  • image_03.png
  • image_04.png
  • Ground foundation construction method
  • Civil Engineering Method
  • Foundation construction
  • Structure removal work

ブックマークに追加いたしました

ブックマーク一覧

ブックマークを削除いたしました

ブックマーク一覧

これ以上ブックマークできません

会員登録すると、ブックマークできる件数が増えて、ラベルをつけて整理することもできます

無料会員登録